Serving: Calhoun, Jackson, Pleasants, Ritchie, Roane, Tyler, Wirt, Wood Counties in West Virginia
December 20, 2017 |September 13, 2017 | June 22, 2017

The following amendments to the 2018-2021Transportation Improvement Program will be made following a vote of the WWW Board on December 20, 2017.

West Virginia TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

MOVTA
Section 5339
Upgrade existing security cameras on buses.

 
$75,000
($60,000 Federal
$15,000 Local)
 
 FY 2019

 

MOVTA

Section 5339

Purchase and install maintenance bus lift for the bus garage.
 
$75,000
($60,000 Federal
$15,000 Local)
 FY 2019


The following amendments to the 2018-2021Transportation Improvement Program were made following a vote of the WWW Board on September 13, 2017.

West Virginia TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

S354-77-0.00 00
NFA-2217(015)D
I-77: Replace inlets/grates in District 3. (GARVEE)
 
$290,000
 
 Construction
FY 2018

 

S354-77-158.69 00
NFA-2217(012)D
I-77: Culvert replacement project. Pond Creek Expressway Drainage. (GARVEE)
 
$150,000 Construction
FY 2018
S354-14-15.20 00
NHPP-0014(170)D
Grand Central Avenue: Replace curb ramps for ADA compliance from
Emerson Avenue in Parkersburg to 34th Street in Vienna.
 
$217,000 Construction
FY 2018
S354-68-17.90 00
STP-0068(176)D
Replace curb ramps for ADA compliance on WV 68 in Parkersburg. Locations include Murdoch Ave. from 8th Street to Emerson Ave., 4th Street from Ann St. to Green St., and Ann Street form the bridge ramp to 5th Street. Project also includes a section in Williamstown on Highland Ave. from 3rd Street to 8th Street.
 
$207,000 Construction
FY 2018
S354-14-11.08 00
STP-0014(169)D
South Parkersburg - Construct ADA compliant curb ramps on WV 14 from Gihon Rd./Rayon Dr. intersection to WV 95, and on WV 95 from Division St. to Elder St.
 
$155,000 Construction
FY 2018
U354-PAR/KE-13.00
TEA-2014(107)D
Parkersburg – Construct Ohio River Trail from Point Park to Memorial        Bridge. Includes construction of a pedestrian bridge over Pond Run.
 
$500,000 Construction
FY 2018
U354-WIL/LI-5.02
TEA-2012(646)D
Williamstown Sidewalk Improvement project (Henderson Ave. and 8th Street).
 
$212,500 Project being included in FY 2018 for Federal reimbursement.

The following amendments to the 2018-2021 Transportation Improvement Program were made following a phone vote of the WWW Board on June 22, 2017.

West Virginia New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

S354-31-3.49 00
STP-0031(051)D
WV 31 (Deerwalk Highway): Resurfacing project (3.31 miles) from US 50 to CR 2/1 (Bull Run).
 
$875,000
 
 Construction
FY 2018.

 

U399-SPT/SB-1.00
SB-11WV(008)D
Staunton-Parkersburg Turnpike wayfinding. Scenic Byways project. Includes design and construction of parking and signage at various spot locations.
 
$80,000 Construction phase moved from FY 2017 to FY 2018.
U354-PAR/KE-13.00
TEA-2014(107)D
Parkersburg – Construct Ohio River Trail from Point Park to Memorial Bridge. Includes construction of pedestrian bridge over Pond Run.
 
$350,000 Project deleted from the TIP. The project was moved from FY 2019 to FY 2017.
S354-618-0.43 00
ACST-0618(001)
WV 618
(Old US 50) – 2.23 miles of resurfacing from WV 68 (Murdoch Ave./Ann Street) to WV 14 Alt. (East Street).
 
$1,500,000 Project deleted from the TIP. The project was moved from FY 2018 to FY 2017.
U354-FRA/NK-1.00
SRTS-2012(661)D
Parkersburg: Franklin Elementary School, Safe Routes to School project. Includes sidewalk construction and crosswalks from 19th Street to Stewart Street.
 
$85,000 Construction phase moved from FY 2017 to FY 2018.
U354-WIL/LI-5.02
TEA-2012(646)D
Williamstown sidewalk improvements from West 9th Street to East 9th Street.
 
$212,500 Construction phase moved to FY 2017.
X354-D-7.00 12
NHPP-0282(145)D
US 50 Corridor D – Seeding, mulching, and bank stabilization from WV 47 to the Blennerhassett Bridge.
 
$2,400,000 Construction phase moved from FY 2017 to FY 2018.
T654-31-19.04 00
STP-0031(044)D
WV 31: Williamstown/Marietta Bridge – Six-year inspection.
 
$625,000 Engineering phase moved from FY 2017 to FY 2019

WV TIP Projects (Administrative Adjustments)

Project #

Project Description

Total Project Cost

Schedule

U354-VIE/NN-1.00
TAP-2014(213)D
WV 14: Vienna Streetscaping project along Grand Central Avenue from 25th Street to 30th Street. Includes sidewalk improvements, curbing, benches, decorative lighting, and landscaping.
 
$124,881

Construction phase moved from FY 2017 to FY 2019.